PAST MAJOR PROJECTS EXPERIENCE
 
OUR GROUP OF WORKERS ARE EXPOSED TO VARIOUS MAJOR JOBS EXPERIENCE DURING THE PAST YEARS, SOME OF WHICH ARE AS FOLLOWS :-

MEMC ELECTRONICS PTE. LTD. ( SUNGEI WAY FTZ )
INSTALLATION OF PVDF & SCH. 80 PVC PIPING FOR THE ULTRAPURE WATER SYSTEM AND PIPING FOR THE TRANSFER OF ULTRA PURE WATER AND COOLANT TO THE CUTTING MACHINE, POLISHER & GRINDER FOR SILICON WAFER MACHINE.

HITACHI SEMICONDUCTOR ( BAYAN LEPAS FTZ )
FABRICATION AND INSTALLATION OF SCRUBBERS INLCUSIVE OF SQUARE POLYPROPYLENE DUCTING FOR THE TRANSFER OF ACIDIC FUME FROM THE TAMURA MACHINE.

INSTALLATION OF POLYPROPYLENE PIPING FOR THE TRANSFER OF WASTE ACID TO THE TREATMENT PLANT.

HEWLETT PACKARD (BAYAN LEPAZ FTZ)
FABRICATION AND INSTALLATION OF POLYPROPYLENE DUCTING FOR ELECTROPLATING MACHINE

INSTALLATION OF POLYPROPYLENE PIPING FOR THE TRANSFER OF ACID WASTE WATER TO WASTE TREATMENT PLANT.

ANSELL (M) SDN.BHD. (KULIM KEDAH)
FABRICATION & INSTALLATION OF POLYPROPYLENE DUCTING FOR THE TRANSFER OF MILD CHLORINE GASES.

MALAY-SINO CHEMICAL INDUSTRIES (IPOH)
FABRICATION OF PVC & CPVC REINFORCE FIBREGLASS TANKS. INSTALLATION & FABRICATION OF PVC, CPVC, FIBREGLASS AND CHLORINATED PVDF PIPING FOR THE TRANSFER OF CHLORINE, HYRODEN GASES AND HOT BRINE.

ANTAH BIWATER J.V.SDN.BHD. (NEGERI SEMBILAN & JOHOR)
FABRICATION & INSTALLATION OF SQUARE PVC DUCTING FOR THE TRANSFER OF FRESH AIR INTAKE & OUTLET FOR PUMP ROOMS AT UPPER JUASEH DAM ( 240 ft. ) & UPPER MUAR DAM ( 120 ft. )

UNIVERSITY HOSPITAL DENTAL FACULTY (SELANGOR) PHASE I,II,III & IV.
INSTALLATION OF POLYPROPYLENE VACUUM PIPING FOR DENTAL CHAIR.

MITSUI COPPER FOIL SDN BHD. (SELANGOR)
PHASE I,II,III,IV & VII.

SILTERRA (M) SDN BHD - KULIM, KEDAH
FABRICATION AND INSTALLATION OF PVDF, PP PIPING FOR UPW BASE BUILD AND TOOL HOOK-UP AND CHEMICAL PIPING INSTALLATION.

ORGANO (ASIA) SDN.BHD. -MALAYSIA.
INSTALLATION OF UPVC, HTPVC, CLPVC, POLYPROPYLENE, HIGH PURITY, PVDF & PPS PIPING AND MECHANICAL EQUIPMENT INSTALLATION FOR THE ULTRA PURE WATER SYSTEM & WASTE WATER TREATMENT SYSTEM INCLUSIVE OF INTERNAL PLANT PROCESS PIPING AS PER THEIR DESIGN AND SPECIFICATIONS. COMPANY'S USING THEIR DESIGN ARE AS FOLLOWS :-
  • FUJITSU ELECTRONICS
  • MITSUI COPPER FOIL
  • CANON OPTIC
  • UEDA ELECTROPLATING
  • SHINKO ELECTRONICS
  • NICHIA
  • SUMITOMO GLOBETRONICS
  • NSC-ELECTRON
  • SHIN-ETSU ELECTRONICS
  • NIPPON ELECTRIC GLASS
  • MALAYSIA QUARTZ CRYSTAL
  • KOBE PRECISION TECHNOLOGY
  • HITACHI CHEMICAL PLANT
  • MATSUSHITA (M) SDN BHD
  • FUJI ELECTRIC, KULIM
  • HAMADATECH

SAMSUNG ELECTRONICS (M) LTE. (NEGERI SEMBILAN)
FABRICATION AND INSTALLATION OF UPVC SQUARE DUCTING FOR THE TRANSFER OF ACIDIC FUME FROM MACHINE TO SCRUBBER SYSTEM..

SHIN-ETSU. (SELANGOR)
FABRICATION & INSTALLATION OF UPVC/FRP AND PP/FRP ROUND DUCTS FOR THE TRANSFER OF ACID, ALKALINE, NOX, MIST AND OIL MIST FUMES FROM THE PROCESS MACHINES TO THE SCRUBBER SYSTEMS.

INSTALLATION OF PROCESS PIPING RANGING FROM 11 DEGREES CELCIUS TO 25 DEGREE CELSIUS USING UPVC PIPING & THERE AFTER INSULATED WITH POLYURETHANE AND G.I.JACKETING.

INSTALLATION OF VACUUM PIPING USING UPVC PIPIES AND STAINLESS STEEL COMPRESSION FITTINGS FOR THE CLEANER MACHINE AND THE TWEEZERS.

KOMAG CAMPUS I (U.S.A) SDN.BHD. (BAYAN LEPAS FTZ)
KOMAG CAMPUS II (SARAWAK) SDN.BHD. (SAMA JAYA FTZ)
KOMAG CAMPUS III (BATU MAUNG, BAYAN LEPAS FTZ)

INSTALLATION OF HIGH PURITY PVDF & SCH. 80 PVC PIPING FOR THE TRANSFER OF HIGH & LOW HIGH PURITY WATER TO THE PROCESS MACHINES.

FABRICATION AND INSTALLATION OF FIBREGLASS, PVC/FRP DUCTING FOR THE TRANSFER OF ACIDIC FUME FROM THE PLATING MACHINE TO SCRUBBER.

INSTALLATION OF SCH. 80 PVC, CPVC & UPVC PIPELINE FOR THE TRANSFER OF WASTE WATER, VACUUM AND PROCESS CHILLED WATER TO AND FROM MACHINES.

 
 
 